Almost a million ANSI lumens, 32 laser projectors, 4 Disguise servers, 450 m2 of led screens, 5km of optical fibers, 8K projection, 25 minutes of animation, 360-degree sound system using 120 speakers, several hundred lighting devices, over 120 artists, 10 days for assembly and only 2 days for trial. The first implementation of the animation on the full plate of the stadium in Poland is behind us!
Play Video
LORD OF THE DARKNESS
A full-scale performance, original choreography and set design, 3 months of dancers’ rehearsals, 50 original tailor-made costumes.
Play Video
UEFA
European event, organized in cooperation with UEFA and UniCredit, special guest Louis Figo.
The Cup was visited by: Warsaw, Munich, Prague, Bratislava and Vienna
VWP RUN
2000 participants in the 5k race, 800 participants in the 900m relay race, 120 children in the 300m race
Play Video
VWP CHRISTMAS
9 original editions, 2 days of the event, 12,000 participants in total, 2,400m² of horizons, 9,000 balloons
VW CADDY 4 / VW T6 TEST DRIVING
10 days of implementation, 21 test cars, over 23,000 km driven in total
Play Video
LUBLIN
7 days of assembly, 10 min. pyrotechnics check-in, 20 min. multimedia show, 50,000 viewers
Ta strona korzysta z ciasteczek aby świadczyć usługi na najwyższym poziomie. Dalsze korzystanie ze strony oznacza, że zgadzasz się na ich użycie.Zgoda